Homepage | Set Home | Add to Favorites
Member

Yangzhou JIERUN Precision Brush Making Equipment Co., Ltd.


Products
  • No Category
Search
 

Friends links

ZG90 High Frequency Straight-welded Pipe Unit
Click image to view full size image
Product: Views:329ZG90 High Frequency Straight-welded Pipe Unit 
Unit price: Negotiable
MOQ:
Quantity:
Delivery date: Since the payment date Days delivery
Valid until: Long-term effective
Last updated: 2021-12-24 20:50
  Inquiry
Details

Configuration: (for reference)

(1) Site occupied by machinery and equipment: 75M × 5M (length × width)

(2) Site occupied by electrical equipment: 7M × 4M (length × width)

(3) Unit foundation (see supplier's foundation diagram)

(4) 2 sets of 10-ton cranes

(5) Power supply:

(a) Equipment motor: 90KW×2+45KW+18.5KW×2+15KW=277KW

(b) High frequency equipment: 300KW (solid state)

(6) One drop frame after the finished steel pipe is cut.

(7) Saw blade for tracking saw, the specification is according to the manual, and the quantity is user-defined.

(8) The magnetic rod for welded pipe shall be ordered according to the pipe specification.

(9) One high-pressure pump for cooling the welded pipe machine, with a diameter of 3 inches and a lift of 6M.

(10) 1 cooling water pool for the pipe welding machine, with a volume of about 35 cubic meters, water pipes, gate valves, etc. (Specifications and quantities are determined during on-site installation, temporarily outsourced).

(11) The electrical circuit of the unit. Before the unit enters the factory, the line must reach the power distribution cabinet in the high frequency room. After the unit enters the factory, it is electrically connected from the high frequency room to the main console and button station of the machine. (Specifications and quantities are determined on-site, temporary outsourcing).

(12) One high-frequency room for the unit. According to the layout of the demand side, the ground type or the attic type can be used.

(13) One air compressor. (Market Procurement)

(14) The equipment reaches the lifting equipment and tools in the buyer's factory. (travel or crane, wire rope, etc.), the heaviest lifting workpiece is 9 tons.

 

 

http://www.jaronmachine.com/

Inquiry